This job consisted of an extensive gas monitoring system, make-up air units, exhaust fans, and a foam suppression system. The explosion proof sensors were installed in a manufacturing setting to monitor and alarm based on high Lower Explosion Limit (LEL) levels and/or low Oxygen (O2) levels. The gas monitoring system is interlocked with the facilities make up air units, exhaust fans, and additional outside air dampers for the purposes of an emergency purge sequence. Upon a further increase in gas levels, the BAS is interlocked with the foam suppression system and the facility emergency notification system.
Project:
Personal Training
Client:
ABC Bank
Year:
2017